[{"data":1,"prerenderedAt":90},["ShallowReactive",2],{"blog-post-en-dwg-field-review-checklist":3},{"id":4,"title":5,"body":6,"category":72,"date":73,"description":74,"draft":75,"extension":76,"featured":75,"image":77,"locale":80,"meta":81,"navigation":82,"path":83,"readingTime":84,"seo":85,"sitemap":86,"slug":87,"stem":88,"__hash__":89},"blog\u002Fblog\u002Fdwg-field-review-checklist.md","A DWG review checklist for site inspections",{"type":7,"value":8,"toc":65},"minimark",[9,13,19,24,27,30,34,37,40,44,47,50,59],[10,11,12],"p",{},"A good site review is fast, but it should not be casual. Before you send observations back to the office, take a few minutes to make sure the drawing context is clear.",[14,15],"blog-figure",{"alt":16,"caption":17,"src":18},"Tablet showing DWG site inspection markers, photo notes, measurements, and a checklist","Inspection notes are easier to act on when each observation stays tied to a location on the drawing.","\u002Fimages\u002Fblog\u002Fsite-inspection-notes-illustration.jpg",[20,21,23],"h2",{"id":22},"before-the-walkthrough","Before the walkthrough",[10,25,26],{},"Open the DWG while you still have a reliable connection, even if the actual review will happen offline. Check that the file opens locally and that the layout you need is available.",[10,28,29],{},"If the drawing has many layers, identify the few that matter for the inspection. Turning off noise makes measurements and notes easier to trust.",[20,31,33],{"id":32},"during-the-walkthrough","During the walkthrough",[10,35,36],{},"Keep each observation tied to a precise location on the plan. Short notes are enough when the location is obvious, but add a photo when the condition will be hard to interpret later.",[10,38,39],{},"For measurements, zoom in first and make sure you are snapping or tapping the intended geometry. A small tap error on a dense CAD drawing can become a large field misunderstanding.",[20,41,43],{"id":42},"before-sharing","Before sharing",[10,45,46],{},"Review the notes list before exporting. Remove duplicates, clarify vague comments, and group related observations when possible.",[10,48,49],{},"The final report should answer three questions: where is the issue, what changed, and who needs to act next.",[10,51,52,53,58],{},"If you are still deciding whether your team needs a broad construction coordination tool or a drawing-first iPad workflow, ",[54,55,57],"a",{"href":56},"\u002Fblog\u002Fconstruction-drawing-app-ipad","what construction teams need from an iPad drawing app"," breaks down the difference.",[60,61],"blog-app-cta",{"buttonLabel":62,"description":63,"title":64},"Download App","Open plans, add notes, measure, and export reports directly from PlanInspect.","Review DWG drawings on site",{"title":66,"searchDepth":67,"depth":67,"links":68},"",2,[69,70,71],{"id":22,"depth":67,"text":23},{"id":32,"depth":67,"text":33},{"id":42,"depth":67,"text":43},"Inspection","2026-06-03","A compact checklist for reviewing CAD drawings on site before you export notes or send issues back to the office.",false,"md",{"src":78,"alt":79},"\u002Fimages\u002Fblog\u002Fdwg-field-review-checklist.jpg","Tablet showing a CAD inspection checklist on top of construction drawings","en",{},true,"\u002Fblog\u002Fdwg-field-review-checklist","3 min read",{"title":5,"description":74},{"loc":83},"dwg-field-review-checklist","blog\u002Fdwg-field-review-checklist","zckgXfU7Qs2QOV4vf48_nTIfHUnpRH5Q1EAgdujAbCM",1782628109610]